This past week has been a mad rush to try to get our home as liveable as possible before Jon heads back to work on Monday. In a few short days, we went from this...
to this..
laundry closet tiled, grouted and sealed

wood floors installed (yet to be sanded/stained)

lots of painting...

(this view is from standing at the kitchen sink - that entryway is the old mudroom, which led to our outside door, - the new door is past that wall and down a couple of steps)

repainted the mudroom wall - straight ahead used to be our back door

repainted the dining room wall AGAIN - and it won't be the last time...we have to rip the wall open again to replace pipes but can't do that until we're ready to rip open the bathroom floor and decided not to do that along with this project
painted and installed floors in Anthony's new room
still so much to do, but it is starting to get to the exciting phase!